Leadville fully operational!

August 23, 2021 | Filed under: Uncategorized

The Leadville machine is back up and fully operational with a completely new solar power system (panels, batteries, and controllers).  The loss of microwave comms was due to both microwave radios being blown, most likely due to a lightning strike.  That restores our microwave link all the way to Grand Junction again too.